Saturday, March 21, 2009

Headspinning Helix (Updated)

One challenge (in fact, 2 actually) I added to my layout is helix construction. I need one at each end of my layout to get to lower deck which is 14 inches from the upper deck. Now, firstly, this is my first layout and secondly, adding 2 helices (!), I got to be nuts.

Anyway, I got to. Else, I would need to run 100 inches of straight track just to get between levels. I don't have the space to do the distance run and it does not make sense.

So, I learnt from other forumers how to calculate helix. Here's my calculation for Algoa single track helix.


Algoa Helix Calculation (from my Ideas Book)


I am waiting for forumers to comment on the above calculations. But, in essence, I am considering 16 inches effective radius to helix edge (to support 15 inches radius to track center) and a 2.5% max grade (Updates: Calculation okayed. Need to mock the helix and test the traction power of loco(s) and no. of cars it(they) can pull.






Jimmy Low


P/S: The Ideas Book is a great idea. I have jotted many notes there and handy to carry around. Do you have yours today?

Friday, March 20, 2009

A Good Idea to Have an Ideas Book

I do so much thinking these days about Rosenberg Meet that I decided to have an Ideas Book. A place to do brainstorming and brain dump. And, it will be a good reference book as the layout progresses. What works and what does not.





I just took about 20 pieces of blank A4 sheets (we use A4 paper instead of Legal) and comb-binded them together. I included my track plan in A4 size as well as A3 size (twice of A4) at the back. The A4 sized plan is placed on right side so that I can use the blank space on left to scribble.




The A3 sized plan can be unfolded which will reveal clearer details.



Besides model railroading, I like writing. I hope to publish a book on Rosenberg Meet one day.




Jimmy Low

Thursday, March 19, 2009

What's On Lower Deck? Galveston Terminal

I have not started work on this yet but here's the preview of what I had in mind.

After exiting the Algoa helix, the train will travel a stretch and reach Virginia point, which is directly below the intersection of the UP Glidden and BSNF Galvesto tracks at upper deck. The Galveston causeway stretches from that point west to where the word "Alvin" is.
The peninsular will host an industry and the Galveston Bay. The space between Alvin up to Rosenberg on lower deck will be Galveston terminal which will have UP and BNSF yards, intermodal terminal and petrochemical industry.



While waiting for Phase 2 Galveston island, I will install a 4 track staging yard beneath Rosenberg. This allows continouous running between Algoa helix and Temple/San Antonio helix (lower wall helix) at lower deck. I will have the mainline installed but not branchlines or yards that Galveston will have.

Lower deck track plan is still in my head but I am seeing a clearer vision now :)



Jimmy Low

A Little Research Adds Realism

A little research goes a long way in adding realism to a layout. Not that I am a rivet counter. Think about it. Everything has a story to tell. The way tracks are laid, the trees branch out, the location of a structure or even some dirt on the track (yes, I noticed something).

I bought this book on BNSF by Brian Solomon. It is an interesting coffee table book that talks about the pre-BNSF days and how each mighty railroad started and merged to become the King of Grain BNSF today.


After all, I am modelling BNSF. It helps to sell them if you know them. Don't you think so?

Jimmy

Wednesday, March 18, 2009

Amtrak Sunset Limited Train No. 2 Is Now Departing for New Orleans via Houston

Good news!

Amtrak Sunset Limited train #2 will pass Tower 17 every Tuesdays, Thursdays and Sundays on my layout to Houston and New Orleans and return as train #1 every Mondays, Wednesdays and Fridays.

I have 3 P42s and 8 Superliner coaches. Amtrak Sunset Limited runs on this configuration: 2 locos (P42, P40 or P32) + Baggage + Transition Sleeper + Sleeper + Diner + Sightseer Lounge + Coach + Coach.


Now, I need to find a Budd baggage car and a transition sleeper in N-scale to complete the configuration.

So, when you see Amtrak Sunset Limited running on UP Glidden in certain direction, you know what day it is.


Jimmy

Tuesday, March 17, 2009

This Weekend's To-Do List (Update #1)

I have this weekend all planned out:

1. Meet Mr Carpenter and his sidekick (Done)
2. Prepare bill of materials and budget - tracks, turnouts, locos, cars, structures, etc. (Done)
3. Source used cardboards - build mock-up layout and helices as template for actual cutting
4. Work out project timeline


Target to start work 1st week of April.


Jimmy Low

Madhatter: That's Me

Stephen Foyt posted his 24 hours at Tower 17, Rosenberg report and concluded that report saying "Anyone who actually read this far must have been REALLY interested." Yes, Stephen. I am one of those who read that far and analysed all the train movements as described by you.

I even looked up Google Map to map each of the start and end destination of the 77 trains you and Julian observed and recorded that winter 2004 day, just to get my orientation right vis-a-vis Rosenberg.

In fact, I went to the extent of analysing each train - the loco model, road number and cars that it hauled. You will notice a certain type of cars come from certain direction. And as I dived further, I found the reason why this is so. Well, I let you read Stephen's report and watch the type of trains that will ply my routes on my Rosenberg Meet.

Interestingly, BNSF tends to use specific motive powers in this region. The common ones are, in descending order of fleet, C44-9W and SD40-2 and SD70MAC. On the other hand, UP loves SD40-2, SD60M and SD70M. You will also see some SD40-2T (Tunnel Motor in Texas??), C44-9W and GP60. I suspect these came from ex-Southern Pacific fleet.

As for cars, definitely lots of rock hoppers and gondolas which are UP's "favourite" haul, the King of Grain BNSF with its grain hoppers and mixture of tanks, boxcars, stacks and trailers mainly by UP from New Orleans and Los Angeles

Now, you know what kind of traffic you will see on my layout and my coming acquisitions. Stay tune.

And, Stephen, someone is watching you :D


Jimmy Low

Monday, March 16, 2009

The Story Behind Rosenberg Meet

Last weekend was another productive one for me. I am happy with this latest track plan for Rosenberg Meet.

Let me run you through this update and the motives behind each track arrangement, position and industry. Give me your feedbacks - positive and areas to improve. I always welcome comments.


Overall Layout
My layout will occupy the existing 11.5ft x 10.5ft utility room. President has approved my real estate acquisition based on the boundries below. I need to present to the Board of Directors the budget, revenue projections, etc. for this project. After all, nobody wants to run a loss-making enterprise, even in a 1:160 world.


Why Rosenberg?
Tower 17 interlocking tower charmed me when I first saw Wes Carr's photo. Since then, I have been researching more about Rosenberg and this is the one for me. I like BNSF and UP, the two Class 1 railroad west of Mississippi River. Both railroads run long trains on their respective subdivision to Galveston.

Modelling BNSF Galveston and UP Glidden subs along this stretch in my utility room fit nicely.


Focus is Tower 17 Rosenberg
I kept reminding myself that Tower 17 junction had to be right to capture the feel and awe of BSNF and UP trains crossing each other. Today, Tower 17 is a museum piece but on my layout, I want to re-enact the last few days of Tower 17 still in operations and with various BNSF and UP liveries still plying that route (if you see some of the photos taken by railfans, SP, SF, BN liveries are still spotted) Tower 17 will NEVER be boring. There is a story to tell and I will be the story teller.

Both UP Glidden track and BNSF Galveston tracks run parallel to each other east of the Tower 17. UP Glidden (to Houston) will disappear at Point B to subroad level and re-emerge at Point B after Alvin. I will model the cotton gin factory at the curve and north of I-90 highway.


Smither's Lake
Between Richmond and Alvin, there is a junction to Thompsons and Smither's Lake where Houston Light and Power (HL&P) coal-fired power plant is located. I will model compressed coal deposit pit and power plant. The track to no-where is the bypass track that connects to UP Popp sub at Alvin. So, it looks like it disappear off the scene and reappear as 90deg crossing at Alvin. Cool eh?


Algoa
Algoa is the intersection between UP Angelston, BNSF Mykawa and BNSF Galveston subdivisions. As mentioned earlier, trains will reappear on Point B and cross below the bridge after Alvin (in reality, there is no such crossing) I added to make the UP Glidden run more interesting as well as allowing UP Glidden to have a continuous running. I added a wye near Algoa which connects to UP Angelston (lift-up bridge) to the other side of upper deck and another track that disappears to no-where.

On BNSF Galveston, the track after Algoa will head downgrade to a helix to lower deck (staging yard for now, Galveston in the future).

There is some empty space right of Algoa (above the helix). I want to model grain elevator. Thus, I am using my creative license to do just that. Is there one in the real Algoa? I did not see it in Google Map.


West of Tower 17
The double track north of Tower 17 is BNSF Galveston sub to Sealy and Temple. Not much focus there but the tracks are long enough to hold 2 locos + 10 cars (represented by light blue line and curve). It heads to Point C and into a double track helix to lower deck staging.

Meanwhile UP Glidden heads west to San Antonio (represented by track to helix). I don't plan to do much at this corner.


Upper Deck



Tell me what you think
I am happy with the overall layout and track arrangement. I will be using Atlas and ME code 55 flextracks and turnouts. The minimum radius is 15 inch to accomodate 6-axle power motives that ply the route. I could not go beyond 15 inch without compromising on the aisle space.

This layout is intended to be run by 3-4 operators. The layout will be DCC using NCE PowerCab (and upgrade to PowerPro later).

The turnouts will be #5 and #7 for most of the locations. I am considering whether to invest in handlaid turnouts. I have 26 turnouts at upper deck. Maybe it is economical after all to buy Fast Track jigs and do it myself.


Links:
TrainBoard: http://www.trainboard.com/grapevine/showthread.php?t=100515&page=5
Model Railroader: http://cs.trains.com/trccs/forums/p/149507/1655831.aspx#1655831

Jimmy Low

Saturday, March 14, 2009

With a Magnifying Glass, Google Map and Pen

Even though Bharani, my carpenter, and Jason could not make it this afternoon to survey the train room and discuss my layout, no time was wasted.
I took out my track plan and started looking at the overall feel of the layout. I started mapping the track arrangements from Tower 17 east and west all the way to Algoa.


In earlier plans, I only outlined the mainlines (BNSF Galveston and UP Glidden) and some sidings that shape Rosenberg Meet. While this is fine for a start and defines the boundary of my layout, I need to make sure I have interesting features captured in the layout. I can't have everything but something just evoke a feel of the place in 1:160 world. I hope to be able to capture that feeling and when someone sees it, he/she will say, oh yea ... that's so-and-so place.

I was working with XTrkCAD, Google Map and a few sheets of paper. I took a closer look at the track arrangements and sketched them on paper. I zoomed for a closer look and some of the amazing things I discovered (to find out what I discovered, you got to wait till the layout is completed and I point them to you then :D)

Okay, back to "track hunting" again. Stay tune.

Jimmy Low

Friday, March 13, 2009

(Did Not) Meet Mr Carpenter


Nope, not Richard Carpenter of The Carpenters siblings.

Bharani, a talented young chap, who built KTMrailwayfan club's benchwork (KTM took back their premises and the benchwork has been dismantled) , will be helping me with my benchwork. In my professional field, it's okay to outsource to the people who can do the task better than yourself. And, a solid benchwork is a MUST or the entire layout will suffer.

As the architect of Rosenberg Meet, I will drive the look and feel of the layout and the finer details while Bharani will help me with the knockings. I have seen his work.

We will meet today (Saturday) at 3pm with Jason, my first N-scale convert, to go through my layout plan. The overall track work is almost done. I will add the helices and other details based on feedbacks. I will also outline the structures and their positions on the layout.

This meeting signals the beginning of the layout construction. We will meet a few times to iron out the details. I intend to do a cardboard mock-up of the layout to get a feel of the layout height, dimensions and aisle spaces. The cardbock mock-up will also serve as a template for the plywood cutouts.

I will update as this progresses. So, stay tune and as always, your inputs are welcomed. Give them early so that I can take into consideration. I typically let a plan open for comments for 1-2 weeks before incorporating any details. 2 weeks is plenty of time. I don't like to rush and regret later. But, I have no regrets starting my first N-scale layout.

This morning, I overheard conversations about trains and I joined in the conversation. A few of my colleagues now know that I am a railfan and modeller. They are waiting for my layout to be ready to play trains! Wooooo Hooooooo!

Update:
Mr. Carpenter did not turn up today. His commuter train was 45 mins late and the heavy downpour in KL prevented him from reaching my place before 5pm. We have rescheduled for next Saturday.


Jimmy Low